Testing the Canopy

Common Ground · Between Rain · Design Resolution

Testing the Canopy

A rain-catching canopy for the Common Ground precinct. Funnel-shaped steel trees carry an ETFE skin, gather the rain and send it down glass downpipes inside each trunk to storage.

My role: designer, sole author. Methods: Rhino 8 and Grasshopper (parametric model), Karamba3D (structural check), Claude working through a Rhino connector at my direction, Nano Banana (one generation and one edit on the interior view).

On this page the drawings, diagrams and interior view are shown on the page colour: their white paper takes the page tone and every other colour is about 5% darker and warmer, legends included. Open any drawing, or the full sheets under Documentation, to see them exactly as issued.

Interior view under the canopy, steel tree columns open into ribbed funnels carrying frosted ETFE cushions, with people walking and seated at plantersTesting the Canopy
Interior view, sheet A4-01. Rhino model with Nano Banana (one generation and one edit) for materials, light, people, planting and the buildings beyond. The view shows the canopy-stage glazed edge; the canopy has since opened (see The Proposal).

Model and image

The interior view began as a view of the Rhino model. Nano Banana added materials, light, people and surroundings. The model view and the issued render are shown side by side so the change can be read.

Rhino model view under the canopy before the image pass: grey steel trees and ribs, plain floor, no people or surroundings
Rhino model, camera AB3, shaded display: the view given to Nano Banana.
The issued interior render from the same camera
Issued render (pass 4), sheet A4-01.
  • From the ModelCamera, trees, ribs and funnels, glass downpipes, planter rings and the glazed line on the right. Nano Banana redrew the ribs from the model view rather than copying them, so rib positions in the render are close to the model but not exact.
  • Added by Nano BananaETFE cushion finish and rain specks, steel finish, light, gravel floor, people, planting, the restaurants and the buildings beyond. The buildings beyond come from the image model, not from the project.
  • Omitted, Approved 10 Oct 2026Representative-bay fixings and services (fin brackets, bolts, saddle drains, air hoses and main), because they are modelled in one bay only.
  • Hand Edits to the ImageNone. The issued file is pass 4 resized to 1920 × 1080.
  • Hand Edits to the Line DrawingsNone. The RCP drawings on sheet A4-01 were drawn by script from the Rhino model and issued as drawn.
The Four Passes
Nano Banana pass 1
Pass 1. Raw output, accepted as the base.
Nano Banana pass 2, rejected
Pass 2. Rejected: copied an earlier reference render instead of the current model.
Nano Banana pass 3, rejected
Pass 3. Rejected: returned the reference render almost unchanged.
Nano Banana pass 4, issued
Pass 4. Issued: an edit of pass 1, new session, no reference image.

Recorded in rounds 198 to 201 of the canopy exchange log. Cause recorded for passes 2 and 3: the earlier render was given as a reference image.

Reflected ceiling plan

Reflected ceiling plan enlargement at 1:50 of tree B3: radiating primary and field ribs, funnel collar, saddle drains and air main, with legend, spot levels and node types
RCP enlargement 1:50, tree B3 (representative bay) to the south saddle, sheet A4-01. Steel frame: designer’s proposal, provisional, subject to a structural engineer’s review and sign-off. Click to open full size.

How it goes together

Exploded axonometric of one tree, from footing to ETFE cushions, with assembly key, cast branch node detail and RCP key plan
Exploded axonometric of tree B3 with its assembly key, cast branch node A (1:20) and the RCP key plan (1:500), sheet A4-01. Shown as issued at the canopy stage. Known drawing limitation (F-04, F-05, G-09), set out below; to be redrawn in the next revision.

Tested, not assumed

Three questions decided the canopy: does the steel frame work, does the skin drain, and should the skin be glass or ETFE. The text below is set from sheet A4-02 word for word.

Since this stage, the canopy has become open, and the frame was checked again under wind. See The Proposal →

1 Structure: Karamba3D frame check

PROVISIONAL design-development check: loads and limits assumed (AS/NZS 1170), to be verified by a structural engineer.

Tested
The full steel frame (24 trees, about 19,200 beam elements, S355) in Karamba3D under assumed loads: ETFE 0.12 kPa or glass 0.50 to 0.65 kPa including fixings, roof live load 0.25 kPa, wind uplift 0.50 kPa, temperature ±25 °C. Four options (A to D) for the collar ring and end ribs, then a shorter short-end overhang.
Showed
Strength was never the limit: with the slim collar ring every member stays well below capacity. Without the ring the hoops at the throat fail (1.17). Sag governs, and only at the two 4.5 m short-end overhangs: 41 to 136 mm against a guide of about 36 mm.
Changed
Slim collar ring CHS 48.3 kept. Short-end overhang cut from 4.5 to 3.1 m (outline 51.2 x 38.0 m) with end ribs CHS 76.1. Adopted frame v11g: highest utilisation 0.61; short-end sag 17 mm under ETFE (28 mm under glass at 0.50 kPa, 33 mm at 0.65 kPa); thermal movement 7 mm, so no movement joint; 84.2 t of steel.
0.61highest utilisation (1.0 = capacity)
17 mmshort-end sag under ETFE (guide about 36)
84.2 tsteel in the members
Two plans of the adopted steel frame: utilisation in the worst strength case (highest 0.61) and sag under the ETFE skin in service (short ends 17 mm, bays 13 mm)
Adopted frame v11g: utilisation in the worst strength case, and sag under the ETFE skin in service. Click to open full size.
Bar chart of the largest short-end sag for options A to D and the adopted frame v11g, glass and ETFE, against a guide of about 36 mm
Short ends: sag by option, glass and ETFE, against a guide of about 36 mm.

Under the canopy in the rain

Rain, damped (12-second loop; use the sound button). The rain as it could sound with the ETFE noise damped. The image itself is still: the rain shadows, the rain outside and the sound are generated by script, not filmed or recorded. The shadows are illustrative; they are not a simulation of how water moves on the skin. An undamped version, and why damping matters, is kept in Project history.

Rework, Counted

Counted from the canopy exchange log, 6 to 11 Oct 2026, with the same definition as the site reading: a correction round is one recorded instance of my rejecting or correcting an output, followed by a revised output. Choices between options and approvals are not counted.

WorkstreamCorrection rounds
Strategy and brief, before modelling10
Form tests3
Model and structure10
Skin fixings3
Renders and animation4
Drawings and sheets20
Reports and scope2
Total52 of 286 rounds, 6 to 11 Oct 2026
  • 15 further rounds are borderline and not counted; with them the total is 67.
  • 8 outputs were rejected outright, and 14 routes were stopped or abandoned.
  • The repeat gate was created at round 156, after I had caught the rib gaps by eye twice (rounds 86 and 146). It was then used on 6 repeatable elements and caught 2 more faults before they were repeated.

Documentation

A4-01 Full Sheet
Full A1 sheet A4-01: RCP enlargement 1:50, key plan, exploded axonometric of one tree and interior view, as issued
A4-02 Full Sheet
Full A1 sheet A4-02: structure, water and skin simulations with tested, showed and changed text, as issued

Sheets: A4-01 RCP enlargement, key plan, exploded axonometric and interior view; A4-02 simulations, as issued 11 Oct 2026. Reports: 01 Structure (Karamba3D), 02 Water, 03 Skin (glass or ETFE).

Still to Do

  • Exploded axonometric (G-09): linework incomplete; to be redrawn and updated.
  • Spot level 6 (F-03, F-07): label and value wrong on A4-01. Correct in the next revision.
  • ETFE cushion foils (F-02): missing from the model (only the cushion edge surface is modelled). Add, indicative rise and sag 9% of span.
  • Trunk members (F-01): unevenly spaced and touching in places. Verify on one tree, then correct the set-out.
  • Structure (G-10): designer’s proposal, provisional; needs a structural engineer.
  • Open canopy (G-11): resolved; the canopy is open at its edges, see The Proposal. Damping the rain sound on the ETFE is still open.
  • Section through the funnel and canopy (G-13): resolved: the 1:50 section on The Proposal cuts through the gate tree’s collar, glass downpipe and chamber.