The Proposal

Design Development

The Proposal

Common Ground Food Lab61 Montague Road, South BrisbaneSharon Robinson

01 · Precinct

Housing, food and public life

Two apartment blocks face each other across the canopy. Cafes and shops line its edges, and the Smart Farm market fills the space between them.

  • HousingAn eight-storey block over cafes on one side of the canopy and a six-storey block over shops on the other.
  • Public LifeThe canopy is the shared room of the precinct: cafe tables, shop fronts and a market for what the farm grows.
  • Design StudyThis is a design study for 61 Montague Road, independent of the Montague Road precinct being planned next door by Economic Development Queensland.

02 · Site and Simulation

Site and simulation

Exploded layers of Lot 10 and its surroundings, from the bottom: flood depth running into the river, transport noise bands, the raised rail viaduct and Merivale Bridge and the William Jolly Bridge, the existing buildings and silos, and the proposed massing on top

Tap the drawing to open it full size

Site

Reading the ground

Four layers of evidence, lifted apart. The proposed massing on top answers each one.

EXPLODED LAYERS: LOT 10

Ground and flood, noise, rail and heritage, what is inherited, and the proposed massing.

Concept diagram, not to scale; bands smoothed, indicative.

The full site reading: The Site →

01 / 04Swipe or use the arrows

03 · Open Canopy

The canopy opens

The canopy is left open at its edges, with no glazed walls or doors, so the market beneath it stays cooler in summer. Opening the edges changes how wind acts on the roof: it now pushes on both the upper and lower surfaces, so the frame developed at the previous stage was checked again under code-based wind loads (AS/NZS 1170.2).

  • ResultThe adopted frame carries the open canopy without new steel. The highest result for the realistic wind direction (along the canopy from its open end) is 0.51; the sheltered long sides give an upper bound of 0.58.
  • MarginEven a uniform uplift of 2.0 kPa, about two and a half times the code’s average uplift on this roof, stays below capacity (0.84).
  • LimitsThe code’s free-roof tables assume flat or simply sloped roof planes. The funnel canopy is outside them, and wind coming down off the apartment blocks is not covered; both need a wind-tunnel or CFD study at the next stage. An early design-stage check, subject to a structural engineer.

Wind load analysis

Four plan diagrams of the canopy frame: the canopy-stage enclosed frame under gravity (highest utilisation 0.38, sag 17 mm) against the open canopy under wind along it from the open north-east end (highest 0.51) and under everyday wind (movement 20 mm); no member over capacity
The canopy-stage frame under gravity (top) against the open canopy under wind (bottom): utilisation on the left, movement on the right. Karamba3D, adopted frame v11g with an ETFE skin. Provisional, subject to a structural engineer.Provisional
Bar chart of highest member utilisation for each wind case on the open canopy, from 0.35 to 0.84, all below the capacity line of 1.0
Highest utilisation in every wind case on the open canopy, with the sensitivity sweep of uniform uplift. Capacity is 1.0. Provisional, subject to a structural engineer.Provisional

04 · Water

Where the water goes

Each funnel tree catches the rain and carries it down a glass downpipe to a handover point at its foot. From there it passes to a common system that treats it, stores it and returns it to the farm. The canopy design resolves the water as far as the handover. Storage is now in concept, with the existing silos used as raised storage, and the rest is still to be designed.

The boundary

The boundary was set during the canopy stage, before any modelling:

bay catchment → local transfer → defined handover → common collection/treatment system. [The canopy stage] resolves through the defined handover. The common collection, treatment, storage and drawdown systems remain downstream and are deferred.Canopy exchange log, round 6, 6 Oct 2026

Two timescales

The canopy works at the timescale of a rain event: minutes and hours. Storage and drawdown work across days, weeks and seasons. An empty downpipe means only that it is not raining; drought shows in the level of the stored water.

dry does not equal drought. A dry catchment simply means it isn’t raining. Longer-term drought or water availability belongs to Storage → Drawdown rather than being symbolised by an empty [canopy-stage] element.Canopy exchange log, round 4, 6 Oct 2026

05 · Above the Flood

Floodwater passes under

Both blocks stand on suspended concrete slabs at 6.3 m AHD, half a metre above the 1% AEP flood level of 5.8 m. Floodwater passes through an open brick skirt and under the floor instead of being pushed aside by a solid plinth.

  • FloorA 250 mm concrete slab on brick-clad concrete columns over bored piles (concept, subject to an engineer). The column grid is being aligned with the apartment walls above.
  • Apartments ForwardLevels 1 and 2 come forward 6.7 m over the cafe arcade, on slim steel columns set on the canopy’s trunk lines.
  • CirculationA core on the street side with a fire stair and two lifts, and a central corridor on every apartment floor.
Section at 1:50 through the gate tree and the edge of the cafe building: the cafe and the balconies above, with planters, on a suspended slab above the flood level; the canopy tree with its collar and trunk over the plaza; people walking and sitting on the seating steps and a bench; and below the paving, the water chambers under each tree, joined by a pipe that runs full.
Section through the gate tree and the cafe edge, 1:50 at A2. Drawn from the Rhino model at the cut through the tree’s trunk line; people and planting added for scale, grey tone marks covered space. Structure and waterproofing are indicative, subject to a structural engineer; the water system, including its overflow, to a hydraulic engineer.Draft

Structure and building

  1. 1Suspended concrete slab 250, floor at 6.3 m AHD, half a metre above the 1% AEP flood level
  2. 2Open undercroft: floodwater passes under the floor through a hit-and-miss brick skirt
  3. 3Arcade pier: 600 mm concrete core clad in 110 mm brick
  4. 4900 mm bored pile under a single pile cap
  5. 5Tie beam, 400 × 600, linking the pile caps under the cafe
  6. 6Hardwood soffit battens on furring channels under the slab
  7. 7Canopy edge tube fixed to the pier through a pocket in the brick
  8. 8Solid concrete balustrade, 1050 mm high, with a planter behind
  9. 9Terrace edge and seating steps, one concrete pour
  10. 10Stair to the cafe entry with a bronze handrail (beyond)

The water, in order

  1. 11ETFE cushion roof on the steel tree frame catches the rain
  2. 12Moulded GRP collar funnels the rain into the top of the trunk, sealed into the glass downpipe
  3. 13Glass downpipe through the trunk: the rain is seen falling to the ground
  4. 14Stainless boot at the foot of the glass, over a removable bar grate
  5. 15Waterproof concrete chamber under each tree, where the rainwater collects; kept at least 3.50 m AHD so the pipe stays full
  6. 16Balance pipe linking the chambers, always under water: the levels even out and the water is pumped to storage from the collection point

Access and furniture

  1. 17Access cover, 600 × 600, flush with the paving
  2. 18Step irons down into the chamber for maintenance
  3. 19Hardwood bench around the trunk on a galvanised steel frame

06 · Community

Community uses

The precinct is meant to be shared, not only shopped in. These community uses are intentions; they are not yet designed.

  • Community KitchenCook and share what the farm grows, linking the market, the cafes and the farm.
  • Farm Learning RoomSchool visits and workshops on how the sealed farm grows food, taught beside it rather than through a window.
  • Weekly Growers’ MarketThe canopy market as a regular public event, not only retail.
  • Flood-Ready Community HallA bookable room above the flood level that becomes a refuge and recovery hub after a flood.

The growing rooms have no windows. The farm is a sealed, artificially lit production space, and the precinct does not put it on display: rain is made legible where it moves, in the canopy, the glass downpipes and the silos, while the farm is met through what it grows, at the market, the cafés and the community kitchen.

07 · Still to Do

What this stage leaves open

  • A second fire stair, likely to be needed at this building height under the NCC.
  • Daylight to the deeper floor plates of levels 1 and 2 (about 21.7 m deep).
  • A structural check of the front columns; the structure is the designer’s proposal, subject to an engineer.
  • Rain off the projecting apartments onto the canopy edge.
  • The community uses above.