The Site

Site Reading

Ground

This site reading examines Common Ground through three diagrams, bringing together water, river relationships, existing conditions and planning constraints. Diagram 01 establishes Lot 10’s relationship to the Brisbane River, while Diagram 02 analyses a second river site using the same method to test how the process transfers and where it needs refinement. Diagram 03 returns to Lot 10 from a different perspective, examining how its infrastructural edges, existing industrial fabric and planning framework condition future change. Together, the diagrams use different readings of site to identify constraints, relationships and conditions that can inform the next stage of design.

Process Record

The rework that went into each diagram

Counted from the site reading’s process log and the two timed workflow tests (WT-01 for Diagram 02, WT-02 for Diagram 03). A correction round is one recorded instance of SR rejecting or correcting an output, followed by a revised output; choices between options and approvals are not counted.

Diagram 01Diagram 02Diagram 03
Correction rounds1453
Other rework recordedRhino route stopped after 6 passes; 17 versions of the vector generator; REV1 (legend) and REV2 (site crop found)5 omission alerts and 2 checklist corrections, approved6 omission alerts, decided
Elapsed timeabout 8 h 30, from file save times (not timed)about 8 h 10, timedabout 2 h 35, timed
Prompts from SRnot recorded6923

The costliest handoff was from the vector generator into Illustrator, where seventeen versions chased drift in the imported linework. Before the next run, the generator would write the finished file directly, with nothing redrawn on import.

The harness

The site reading ran on a written harness: the sequence of passes, the context each tool is given, eleven guardrails and the prompts. It is kept in the project record, so the method can be run again on another lot. Full text available on request.