Under the canopy on a rainy afternoon: funnel-shaped steel trees rise from planted beds and carry a translucent cushion roof with rain beading on top, with cafes on the left, a produce market in the middle and people walking on dry paving in front of an old brick wall hung with plants

COMMON GROUND · BETWEEN RAIN

COMMON GROUND

Visualisation · canopy interior
Detail of the Karamba3D sag plot of the adopted canopy frame under the ETFE skin: ribs radiating from each tree, drawn darker where the frame moves most (largest 17 mm)
Design Resolution

Testing the Canopy

The canopy tested before the precinct: structure, drainage, glass against ETFE, and how one tree goes together.

Open
Aerial view of the precinct on the Brisbane River: the kept industrial buildings with their silos, the new apartment blocks and the canopy between them
Design Development

The Proposal

A mixed-use precinct at 61 Montague Road: housing, cafés, shops and a Smart Farm around an open rain canopy, raised above the flood. Drawings, renders and the water, energy and wind checks.

Open
Public laneway with seating beside a water channel, under shade, between rain
Brief and Concept

The Concept

Where the project began: a question about making rain perceptible rather than hiding it. The brief, the client, Common Ground Food Lab, and concept studies of capture, transfer, growing and public life.

Open
Diagram 03 drawing: three stacked plates. Top: the Priority Development Area covers Lot 10 and the land to the river and stops at the road and rail corridors. Middle: what lies on Lot 10's boundary: Montague Road and Boundary Street, the rail corridor, Lot 12 on CP852775 and the riverfront land. Bottom: Lot 10.
Site Analysis

The Site

Reading the site at 61 Montague Road and its relationship with the Brisbane River, with every claim checked against a source.

Open
Method

Approach

Tools, protocols, the review register and where my judgement sits.

Open
Reflection

About

What this stage achieved, what is still open, and what comes next.

Open
How I Work

Two Decisions

The Pipe That Always Runs Full

The 1:50 section first showed a level collector pipe between the trees. A level pipe only works if it stays full, so it was questioned until the strategy changed: the collectors now act as balance pipes, and the minimum water level in storage is held at 3.50 m AHD, so they always run full. Overflow and treatment are left for a hydraulic engineer.

See the section in The Proposal

Nothing Left Out Without Saying So

An early site diagram was framed so that part of the lot was cropped, and nothing on the sheet said so. Since then, no tool may crop, omit or simplify evidence without stopping first: it states what will change and why, the designer decides, and any approved change is stated on the drawing.

See the rules in Approach
Sharon Robinson. Designer.
2026